Mission Creek Dike Construction

Project Description

This project involved the construction of a 200 m section of dike along the south bank of Mission Creek in the City of Kelowna. Services included the acquisition of the required environmental permits; regular inspection of erosion and sedimentation control measures, including instream turbidity curtains; conducting two fish salvage operations at different stages of the dike construction; conducting regular water quality monitoring during dike construction; preparing an environmental monitoring summary report; and the submission of fish collection data as per the requirements of the fish collection permit.

Client

City of Kelowna, BC