Meet the Team
Transportation Engineer
Senior Transportation Engineer
Project Engineer
Partnering with Gehl Studios, Urban Systems developed and constructed the redevelopment of the 61st Ave SW Greenway Corridor – a crucial pedestrian link between the Chinook LRT Transit Plaza and Chinook Centre. The design emphasized the importance of creating a vibrant and inviting pedestrian experience with new street trees, a landscaped centre median, custom street furniture and walkway treatments, lighting and widened sidewalks. Our team also worked closely with the City of Calgary to ensure that while the emphasis focused on pedestrian and active modes enhancements, an acceptable level of service for motorists was maintained, allowing them to strike a balance between road safety, traffic operations, pedestrian accessibility, active modes and transit.
Transportation Engineer
Senior Transportation Engineer
Project Engineer