Urban Systems
Hamburger
Urban Systems
  • Our Work
  • Our Clients
  • Our Offices
  • About
  • CAREERS
Urban Systems
City of Chilliwack, British Columbia

Vedder Bridge

​The Vedder Bridge Replacement involved several physical and environmental constraints making it a challenging project requiring superior project management skills, innovative engineering design, and construction expertise that the design build team was able to deliver.​ Urban Systems teamed with Emil Anderson Construction (EAC) and Klohn Crippen Berger (KCB), to form a multidisciplinary team that used it’s extensive history and strong working relationships to align design and constructability requirements in an effort to propose the most efficient solutions possible. The full scope of the project included the configuring of 2 wider travel lanes, shoulders and multi-use paths on both sides of the structure. ​Urban Systems was responsible for the road and drainage design, and traffic engineering and utilities design, which included the reconfiguration of the approaching roads and adjacent intersection.

Vedder Bridge

Related Case Studies

Securing Cochrane’s Water Future

Solving Alberta Town Water Issues

Securing Cochrane’s Water Future
Indigenous Knowledge and Climate Change Study

Smith's Landing First Nation

Indigenous Knowledge and Climate Change Study
Traditional Use, Knowledge and Ground-Truthing Study

Doig River First Nation

Traditional Use, Knowledge and Ground-Truthing Study
  • Our Work
  • Our Clients
    • Indigenous Communities
    • Private Sector
    • Local Government
    • Provincial Government
  • Our Offices
  • About
    • Who we are
    • Our People
    • Events
    • Our Foundation
    • Urban Matters
    • Our Stories
    • Contact Us
  • CAREERS
  • CONTACT US
  • FIGHTING AGAINST FORCED LABOUR AND CHILD LABOUR REPORT
  • PRIVACY POLICY
Copyright © 2025 Urban Systems.
All Rights Reserved.
  • CONTACT US
  • FIGHTING AGAINST FORCED LABOUR AND CHILD LABOUR REPORT
  • PRIVACY POLICY